Event: 72hr Urban Action – In progress

The RMIT landscape urbanism 3 day design challenge is under way.  Myles is working with Team X to design and construct a public space responding to the brief provided by the Urban Realities team.

href=http://www.youtube.com/watch?v=eZAMMOKAldA&feature=player_profilepage

The brief for Team X is to ‘cut and fold the surface, opening and revealing to create an inhabitable skin’.  The site is Site 8 located at the New Quay Promenade, Docklands.

Yesterday was a full day of measuring and analysing the site before Team X begins to design and construct their installation.

href='http://www.youtube.com/watch?v=OUUv0tAjoH4&feature=player_detailpage

With Shed 4 stocked up with materials and tools, today is the day for the 10 teams to start building their installations.

To get involved in the State of Design event, vote for Team X’s design here.

The Docklands site is open to the public and guided tours are held throughout the competition.  The projects will be displayed until August 7.

Follow Team X’s progress check out their facebook, twitter or UrbanReality Blog.